Union Center Redevelopment Project:
Union
Ctr. Gateway North Draft (from Jan '08)
Gateway North
Presentation (from Feb '08), also available in
PDF format
Roadway:
• Elmwood Avenue Project: Resurfacing and
widening Elmwood Avenue between Savitt
Place and Morris Avenue.
•
2006 Roadway
Improvements Program: Currently in construction phase. Contract I
-
Stanley Terrace, Moutainview Avenue, Lincoln Avenue and Whitewood Road.
Contract II -
Indian Run Parkway North & South, Florence Terrace, Gakley Drive, Parkview
Drive, Colonial
Road West, Bailey Avenue, Jean Terrace, Ellen Street, Stratford Road,
Winthrop Road,
Burke Road and Wyoming Avenue.
•
Mill Run Streetscape: Improvements to Walker Avenue & Manor
Drive including lighting,
shade trees, handicap ramps, and crosswalks - construction to begin
by May 2007
Parks:
•
Joe Collins Park, to be upgraded with tot lot, swing set,
and walkway with exercise
station.
•
Field No. 1
Sports Lights at Biertuempfel Park. Project consists of
installation of lighting for
the softball field.
Infrastructure:
• Upgrade underground storage tanks at Police, Fire,
and Public Works.
• Lightning Brook Wall Collapse. Project consists of
repairing 240 feet of retaining wall on
the Irvington Branch of Lightning Brook.
• Fairway Drive Sewer Improvements - in design phase
Buildings:
•
Municipal Complex (Town Hall & Library) - upgrade drainage
and waterproofing.
Construction to begin in Spring of 2007.
• Main Library Upgrades. Currently in design
phase. Project consists of internal
improvements new windows, new HVAC fixture.
Flood Control:
•
Received $1.1 million grant from NJDEP to correct localized
street flooding in the
Connecticut Farms section. Design in 2006 followed by
construction in mid-late
2007.